Anderson Dry Weather Pump Station And Force Main Rehabilitation
Choose Plan Sheet:
«
»
COVER - COVER SHEET
G100 - GENERAL INFORMATION
C100 - GENE GUSTIN BYPASS
C101 - FM-S 200+00-208+50
C102 - FM-S 205+50 - 219+00
C103 - FM-C 216+50 - 225+00
C104 - FM-C 224+00 - 231+56
C105 - DEWEY SITE PLAN
C106 - DRY WEATHER PUMPS DEMO
C107 - DRY WEATHER PUMPS PROPOSED
C201 - EROSION CONTROL PLAN - 307+40-314+25
C202 - EROSION CONTROL PLAN - DEWEY STREET
C203 - EROSION CONTROL NOTES
C204 - EROSION CONTROL DETAILS
C300 - FORCEMAIN DETAILS
C301 - PUMP STATION DETAILS
C302 - WATER MAIN DETAILS
S101 - GENERAL STRUCTURAL NOTES
S201 - EPS – STRUCTURAL MODIFICATIONS PLANS
S301 - EPS - SECTIONS AND DETAILS
S401 - EPS – CRANE FRAMING PLAN & DETAILS
S402 - EPS – FRAMING SECTION & DETAILS
S403 - EPS - HANDRAIL SECTIONS AND DETAILS
E100 - OVERALL ELECTRICAL SITE PLAN
E101 - DRY WEATHER PUMP STATION - EXISTING AND DEMO WORK
E102 - DRY WEATHER PUMP STATION - NEW WORK
E103 - DRY WEATHER PUMP STATION ELECTRICAL ONE-LINE DIAGRAM - DEMO WORK
E104 - DRY WEATHER PUMP STATION ELECTRICAL ONE-LINE DIAGRAM - NEW WORK (1)
E105 - DRY WEATHER PUMP STATION ELECTRICAL ONE-LINE DIAGRAM - NEW WORK (2)
E106 - DRY WEATHER PS I&C, AND NETWORK ONE-LINE DIAGRAM - DEMO WORK
E107 - DRY WEATHER PS I&C, AND NETWORK ONE-LINE DIAGRAM - NEW WORK
E108 - DRY WEATHER PUMP VFD DRIVE UNIT DETAILS
E109 - PANELBOARD SCHEDULE AND GENERAL ELECTRICAL DETAILS
E110 - REFERENCE PICTURES AND GENERAL NOTES
I101 - DRY WEATHER PLC CONTROL PANEL LAYOUT
I102 - DRY WEATHER PLC CONTROL PANEL WIRING DIAGRAM (1)
I103 - DRY WEATHER PLC CONTROL PANEL WIRING DIAGRAM (2)
I104 - DRY WEATHER PLC CONTROL PANEL WIRING DIAGRAM (3)
I105 - FIELD TERMINATION PANEL LAYOUT DETAILS
I106 - INSTRUMENTATION DETAILS
Page:
Previous
Next
Use Ctrl + mouse scroll wheel over the document to zoom.